You are here

Multimedia Images

Primary tabs

Image Title Media Description Date
LPF_Mission_Overview_preview
Nov 18, 2015
LPF oxidiser fuelling LPF oxidiser fuelling now complete LPF Current Status: Oxider fueling now complete, next step is the hydrazine fueling. Read...
Nov 05, 2015
ESA tracking antenna at in ESA tracking antenna Malindi For the launch of LISA Pathfinder (LPF), the injection strategy imposed by the Vega ...
Oct 07, 2015
LPF alignment tests LISA Pathfinder alignment tests   Date: 15 October 2015 Satellite: LISA Pathfinder Location: S5C building, Centre Spatial...
Nov 05, 2015
Fitting the clamp band Date: 14 October 2015 The ground clamp-band, between the LISA Pathfinder science module (...
Nov 09, 2015
Fitting the clamp band 2 The ground clamp-band, between the LISA Pathfinder science module (above, gold-...
Nov 09, 2015
The An-124 carrying LPF arrives at Kourou LISA Pathfinder arrives at Kourou | Image 2 LISA Pathfinder has arrived at Cayenne Airport at Kourou in French Guiana, approximately...
Oct 08, 2015
The An-124 carrying LPF arrives at Kourou LISA Pathfinder arrives at Kourou LISA Pathfinder has arrived at Cayenne Airport at Kourou in French Guiana, approximately...
Oct 08, 2015
LISA Pathfinder Antonov at Cayenne Airport Transporting LISA Pathfinder to Kourou The spacecraft, along with specialised support equipment, was transported from London on...
Oct 15, 2015
LPF unloaded at Kourou LPF arrives at Kourou | Image 3 The spacecraft, along with specialised support equipment, was transported from London on...
Oct 12, 2015

Pages